We never show street addresses, even though they appear in the public FAA file. Individual owners are shown by city and state only.
Airframe & engine
FAA Registry + type data
Airframe
Manufacturer
Embraer
Model
EMB-145LR
Year
2002
Serial number
145610
Aircraft type
Fixed wing multi engine
Category
Land
Certification
Type Certificated
Seats
55
Engines
2
Max takeoff weight
12,500 - 19,999 lb
Mode S code
AD2807
Engine
Make and model
Rolls-Royc Ae 3007a1p
Type
Turbo-fan
Power
8,338 lb thrust
Total time and engine hours aren't public. They appear here once the owner adds logbooks.
Ownership history
Ownership history from FAA records
2022 – nowDelux Public Charter LLCDallas, TX · current
Individual owners are shown by city and state only.
Safety record
NTSB · Oct 15, 2026 · FAA ADs · Oct 20, 2026 · SDRs · Oct 16, 2026
NTSB events (1)
Incident · minor damage
Mar 13, 2010 · Chicago, IL
An in-flight encounter with lightning. Contributing to the incident was the damaged and displaced tailcone bulkhead frame that inhibited the full travel of the elevator during approach.
These match the airframe or engine model. Whether each one applies, and whether it's been complied with, depends on serial numbers, equipment and logbook entries. Applicability must be confirmed by a mechanic against the aircraft's records.
Airframe (EMB-145LR)Serial numbers per EMBRAER Service Bulletin 145-27-0088, dated February 1, 2002. Only with: Equipped with horizontal stabilizer actuator (HSA) assemblies having part numbers and serial numbers listed in EMBRAER Service Bulletin 145-27-0088.
Airframe (EMB-145LR)Certain serial numbers: EMB-145 145004–145047; EMB-145 145049–145051. Only with: Equipped with IC-600 #1 P/N 7017000-82402; excluding airplanes modified per EMBRAER SB 145-22-0001, SB 145-22-0004 Rev 01, or SB 145-31-0007 Rev 02.
AI-extracted — verify against original. Matched from each AD's applicability section; ADs replaced by a later AD are left out.
Service Difficulty Reports (3)
Reports of failures and defects that operators and repair stations sent to the FAA since 1995. A report describes one finding; it is not an accident.
Indicating and recording systems · warning message · multiple failMay 26, 2025
CREW REPORTED- WHILE AT FL360 EN-ROUTE TO LAS, AUTOPILOT FAILED FOLLOWED BY MULTIPLE SYSTEM FAILURES EMBLEMATIC OF A DC BUS1 FAILURE EVEN THOUGH DC BUS 1 FAIL DID NOT APPEAR ON THE EICAS. SYSTEMS INCLUDED TRIM, PRESSURIZATION , HYDRAULICS, FLAPS, SPOILERS, ETC. ALSO INCLUDED ANTI-ICE, SPS, LG…
From FAA Service Difficulty Reports; matched by N-number and serial number.
Electrical power · terminal · damagedMay 26, 2025
PILOT REPORTED-WHILE AT FL360 EN ROUTE TO LAS, AUTOPILOT FAILED FOLLOWED BY MULTIPLE SYSTEM FAILURES EMBLEMATIC OF A DC BUS1 FAILURE EVEN THOUGH DC BUS 1 FAIL DID NOT APPEAR ON THE EICAS. SYSTEMS INCLUDED TRIM, PRESSURIZATION , HYDRAULICS, FLAPS, SPOILERS, ETC…ALSO INCLUDED ANTI-ICE, SPS, LG…
From FAA Service Difficulty Reports; matched by N-number and serial number.
Electrical power · contactor · looseDec 23, 2024
CREW REPORTED- CLIMBING THROUGH 19,000 FEET, WE HAD A BLACKOUT. PFD 1, MFD 1, EICAS, RMU 1 & 2, AND FMS 1 & 2 CAME BACK AFTER 3 SECONDS. PFD 2 AND MFD 2 TOOK ABOUT 20-25 SECONDS TO COME BACK. WE HAD TONS OF EICAS MESSAGES THAT POPPED UP WITH 3 BEING RED. ON THE EICAS, WE DIDN’T HAVE ANY…
From FAA Service Difficulty Reports; matched by N-number and serial number.