THE PLT REPORTED THAT THE STRIP HAD ABOUT 1,500 FT OF USABLE LENGTH, THE REMAINING 3,050 FT CONSISTED OF UNPACKED SNOW &SLUSH. THE USABLE WIDTH OF THE FIRST 1,500 FT WAS REPORTED AS 8-12 FT. AT THE TIME OF TAKEOFF THE FIRST 1,500 FT WAS COVERED WITH HARD PACKED MELTING SNOW & SOME SLUSH. ABOUT 200 FT INTO THE TAKEOFF ROLL THE ACFT ENCOUNTERED A DEEP AREA OF SNOW/SLUSH. DIRECTIONAL CONTROL WAS…
These match the airframe or engine model. Whether each one applies, and whether it's been complied with, depends on serial numbers, equipment and logbook entries. Applicability must be confirmed by a mechanic against the aircraft's records.
No ADs published since 1998 matched this airframe or engine model.
AI-extracted — verify against original. Matched from each AD's applicability section; ADs replaced by a later AD are left out.
Service Difficulty Reports (0)
No Service Difficulty Reports found for this airframe since 1995.